Live draft · changes as you edit
Supplier invoice payment agent
Pay approved supplier invoices on time with less manual effort
| Use case | Pay approved supplier invoices on time with less manual effort |
|---|---|
| Date | 2026-10-06 |
| Document version | live draft |
| Snapshot | — |
| Flow AI-SIL | AI-SIL 3 |
| Status | draft (specified) |
| Logic Pack | v0.6.7 |
Legend entries mean "contributes to" a framework or standard — never a statement of conformity.
Test version: generated by the AASIF test tool with an uncalibrated Logic Pack. Not a certification.
0 · Executive summary
0.1 Classification at a glance
- Classification
- Flow AI-SIL 3 · Safety Integrity Level 3
- Driving hazard
- The level is driven by H06 Manipulated input or goal hijack (prompt injection, poisoned documents or memory): S3 (organization S3, persons S1), E3, C3 → AI-SIL 3, critical even if rare.
- Status
- draft (specified)
- Go-live readiness
- Blocking checks: none · Required measures before go-live: 0 of 43 implemented
Patterns found: Irreversible and unattended, Rubber-stamp approval, Untrusted input meets private data, Critical even if rare
0.2 Top risks
| ID | Hazard | AI-SIL | Worst credible harm |
|---|---|---|---|
| H06 | Manipulated input or goal hijack (prompt injection, poisoned documents or memory) · critical even if rare | AI-SIL 3 | Major or existential financial loss; major sanction or license risk; severe reputational crisis |
| H01 | Wrong decision or action from incorrect output (hallucination, misreasoning) | AI-SIL 2 | Material financial loss for the business unit; customer-visible incident; regulatory finding |
| H03 | Irreversible commitment executed before review (payment, contract, deletion, external message) | AI-SIL 2 | Material financial loss for the business unit; customer-visible incident; regulatory finding |
0.3 Decisions and sign-offs needed (5)
- GA09 Failure mid-action · owner: Engineering / IT
- GA10 Error discovered afterwards · owner: Process owner + legal
- GA11 Objection by an affected person · owner: Legal / compliance
- GA15 Switch-off and fallback · owner: Process owner
- T14 Marked unsure · owner: Expert review
- Flow AI-SIL 3 (3 or higher) and 1 item marked unsure → expert review of the classification recommended (independence per T5) · independence I2 (independent of the responsible team)
0.4 Commitments before go-live
- Required measures (++ or by law)
- 43
- Of which in Phase 0
- 43
- Recommended measures added (+)
- 4
- Balance over the top hazards
- 12 prevent · 6 detect & recover
| ID | Top measures |
|---|---|
| M41 | Authenticated and validated inter-agent messaging |
| M49 | Output and egress control (no auto-rendered external links or images; egress allow-list) |
| M13 | Kill switch: halt and lock autonomous action |
| M18 | Decision logging (inputs, actions, model version, rationale) |
| M26 | Untrusted content isolation (external content treated as data; provenance marked) |
0.5 Legal obligations and regulatory flags
| ID | Obligation | Required measures |
|---|---|---|
| LO01 | Art. 4 · AI literacy of staff dealing with the AI system | M39 |
| LO04 | Art. 50 · Transparency: persons are informed that they interact with an AI system | M34 |
- T02 · Do decisions affect persons outside the organization (customers, applicants, citizens)? · yes
- T13 · Does the agent communicate directly with humans (chat, email, voice)? · yes
Contributes to: EU AI Act Art. 4, 9, 10, 11, 12, 13, 14, 15, 17, 19, 25, 26, 43, 50, 72, 73; ISO/IEC 42001 Cl. 5, 6, 7.2, 7.5, 8, 9, 10, A.3, A.4, A.6, A.7, A.8, A.9, A.10; NIST AI RMF GOVERN, MANAGE, MAP, MEASURE; Singapore MGF D1, D2, D3, D4 (see 5.1).
0.6 Review and approval
| Activity | Required independence |
|---|---|
| Review of the AI-SIL classification | I2 · independent of the responsible team |
| Review of the AASIF Safety Concept | I2 · independent of the responsible team |
Flow AI-SIL 3 (3 or higher) and 1 item marked unsure → expert review of the classification recommended (independence per T5)
| Sign-off | Name and role | Date | Signature |
|---|---|---|---|
| Accountable owner | |||
| Reviewer |
1 · Use case and scope
1.1 Purpose and scope
- What should the agent achieve for the business?
- Pay approved supplier invoices on time with less manual effort
- Where does it sit in the business process? What happens before and after?
- After invoice receipt and order matching in the ERP; before the daily bank payment run
- What must the agent never do? Which cases are excluded?
- Never change bank details; no payments to suppliers not in the vendor master; no splitting of invoices to stay below limits
1.2 Item definition and agent actions
- How autonomous is the agent?
- acts and informs
- Who is affected by its outcomes?
- internal teams, suppliers
- Organization context
- private · Manufacturing, about 5,000 employees, private company
- Which data does the agent use?
- confidential, untrusted external · Supplier invoices received by email (external), vendor master, bank details
- Which systems and tools can the agent use?
- ERP read/write, payment API, email
- Does it work with other agents or other organizations' systems?
- yes · Ordering agent (internal) sends purchase orders; House bank payment API (external system)
- How do humans oversee it today?
- Accounts payable clerks review exceptions and all payments above €10k · 40 per hour
- How many decisions does the agent make?
- 800 per day
- Which model or product powers it, and who controls updates?
- vendor-managed · Vendor LLM, updates by the vendor
- Does the agent's output inform decisions about people, money or regulated controls, even if a person makes the final call?
- yes
- Where is the agent used? (jurisdictions)
- EU / EEA
- Does the agent decide, or prepare a decision, about individual persons?
- no
| ID | Action (verb + object) | What does the action change in the world? | Can the effect be undone? | Typical and maximum size of the effect | How often does the agent take this action? | Does a human check before the effect happens? | Which inputs does the action rely on? | Is the maximum effect of this action material for the organization? | Does the result reach people outside the organization, now or later (e.g. in a client deliverable, a publication or a letter)? | If a person checks before the effect: does this check meet all four criteria of a qualified human gate? |
|---|---|---|---|---|---|---|---|---|---|---|
| ACT-01 | Matches invoice to purchase order | internal record | fully and instantly | One invoice record; typical €2k, maximum €250k | many times per day or continuous | on exceptions only | Invoice PDF from supplier email (untrusted), purchase order from the ordering agent | material | no | – |
| ACT-02 | Pays supplier invoice | money movement | with effort or cost | Typical €2k, maximum €250k | many times per day or continuous | on exceptions only | Matched invoice, vendor master bank details | material | yes | – |
| ACT-03 | Sends payment advice email to supplier | external message | not at all | One supplier contact per payment | many times per day or continuous | never | Payment record, supplier contact data | immaterial | yes | – |
1.3 Roles and accountability
| Responsibility | Role or group | Owns |
|---|---|---|
| Accountable role (GA13) | Head of accounts payable is accountable; deputy: AP team lead | Agent decisions · M35 Named accountable owner and responsibility matrix (value chain + three lines of defense) |
| Expert group | Process owner | Scope & authority · Human oversight · Monitoring · open point GA15 |
| Expert group | IT architecture | Scope & authority · Multi-agent |
| Expert group | HR | Human oversight |
| Expert group | works council (DACH) | Human oversight |
| Expert group | Engineering / IT operations | Safe state · Monitoring |
| Expert group | Engineering | Logging |
| Expert group | internal audit | Logging |
| Expert group | Engineering / QA | Validation |
| Expert group | CISO | Security-for-safety · Multi-agent |
| Expert group | Data protection officer | Data & rights |
| Expert group | legal / compliance | Data & rights · open point GA11 |
| Expert group | Risk / compliance | Governance |
| Expert group | management | Governance |
| Expert group | Engineering / IT | open point GA09 |
| Expert group | Process owner + legal | open point GA10 |
2 · Risk assessment
2.1 Grey areas and decisions
| ID | Situation | Scope | Design decision | Owner |
|---|---|---|---|---|
| GA01 | Missing data | whole flow | Stop and escalate to accounts payable; never guess missing order numbers | Process owner |
| GA02 | Conflicting information | whole flow | Escalate when invoice and order amounts differ by more than 2% | Process owner |
| GA03 | Limit reached | whole flow | Block and escalate; never split an invoice to stay below the €10k limit | Process owner + risk |
| GA04 | Uncertainty | whole flow | Escalate with context; never proceed with a flag for payments | Process owner |
| GA05 | Out-of-scope request | whole flow | Refuse, log and route to a human | Process owner + CISO |
| GA06 | First-time or unusual case | whole flow | First invoice from a new country goes to a human | Process owner |
| GA07 | Human unavailable | whole flow | Safe default: do not pay; notify the deputy approver | Process owner |
| GA08 | Suspected manipulation | whole flow | Freeze the payment and verify bank details by phone through a known contact; alert security | CISO + process owner |
| GA12 | Changed rules or context | whole flow | Head of accounts payable owns rule updates; regulation changes trigger re-classification | Process owner + compliance |
| GA13 | Accountability | whole flow | Head of accounts payable is accountable; deputy: AP team lead | Management |
| GA14 | Data boundaries | whole flow | Never use or store employee bank details; supplier bank details only from the vendor master | Data protection officer |
4 open points — see 4.1.
2.2 Hazards and ratings
Legend: S0–S3 Severity, how bad the worst credible harm is · E0–E4 Exposure, how often the agent acts on its own in that situation · C0–C3 Controllability, how hard the harm is to avoid · AI-SIL 0–4 = S + E + C − 6.
| ID | Hazard | Source | Severity (organization) | Severity (people) | Exposure | Controllability | AI-SIL | S3 | Override |
|---|---|---|---|---|---|---|---|---|---|
| H01 | Wrong decision or action from incorrect output (hallucination, misreasoning) | guide_word G02 | S2 | S1 | E4 | C2 | AI-SIL 2 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Matches invoice to purchase order' runs many times per day; for 'Wrong output' the hazard situation usually occurs about as often as that (E4). · Starting point: in the 60 reference cases the harm of 'Wrong output' could typically be corrected only with effort or delay (C2). Confirm it for your case. | |||||||||
| H02 | Action beyond authorized scope (wrong tool, wrong amount, wrong recipient) | trigger T07 | S2 | S1 | E3 | C2 | AI-SIL 1 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Pays supplier invoice' runs many times per day; for 'Beyond authority' the hazard situation usually occurs somewhat less often (E3). · Starting point: in the 60 reference cases the harm of 'Beyond authority' could typically be corrected only with effort or delay (C2). Confirm it for your case. | |||||||||
| H03 | Irreversible commitment executed before review (payment, contract, deletion, external message) | trigger T01 | S2 | S1 | E4 | C2 | AI-SIL 2 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Pays supplier invoice' runs many times per day; for 'Irreversible before review' the hazard situation usually occurs about as often as that (E4). · Starting point: in the 60 reference cases the harm of 'Irreversible before review' typically could not be corrected (C3). Confirm it for your case. | |||||||||
| H04 | Correct behavior causes harm: misspecified objective or shortcut (reward hacking) | trigger T14 (unsure) | S2 | S1 | E3 | C1 | AI-SIL 0 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Matches invoice to purchase order' runs many times per day; for 'Right but harmful' the hazard situation usually occurs about as often as that (E4). · Starting point: in the 60 reference cases the harm of 'Right but harmful' could typically be corrected only with effort or delay (C2). Confirm it for your case. · Once step 'Sends payment advice email to supplier' has taken effect, it cannot be undone. Ask whether the harm can still be corrected before it causes real damage. | |||||||||
| H05 | Out-of-envelope context (new domain, market, population or data shift) | guide_word G11 | S2 | S1 | E2 | C2 | AI-SIL 0 | – | – |
| Reasons: The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Matches invoice to purchase order' runs many times per day; for 'Outside the design envelope' the hazard situation usually occurs somewhat less often (E3). · Starting point: in the 60 reference cases the harm of 'Outside the design envelope' could typically be corrected only with effort or delay (C2). Confirm it for your case. | |||||||||
| H06 | Manipulated input or goal hijack (prompt injection, poisoned documents or memory) | trigger T06 | S3 | S1 | E3 | C3 | AI-SIL 3 | critical even if rare | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Matches invoice to purchase order' runs many times per day; for 'Manipulated input' the hazard situation usually occurs somewhat less often (E3). · Starting point: in the 60 reference cases the harm of 'Manipulated input' could typically be corrected only with effort or delay (C2). Confirm it for your case. | |||||||||
| H08 | Unfair or discriminatory outcome for affected persons | trigger T02 | S1 | S2 | E3 | C2 | AI-SIL 1 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Pays supplier invoice' runs many times per day; for 'Unfair outcome' the hazard situation usually occurs somewhat less often (E3). · Starting point: in the 60 reference cases the harm of 'Unfair outcome' could typically be corrected only with effort or delay (C2). Confirm it for your case. | |||||||||
| H09 | Cascading or emergent failure across agents | trigger T09 | S2 | S1 | E4 | C2 | AI-SIL 2 | – | – |
| Reasons: The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Matches invoice to purchase order' runs many times per day; for 'Cascade' the hazard situation usually occurs somewhat less often (E3). · Starting point: in the 60 reference cases the harm of 'Cascade' could typically be corrected only with effort or delay (C2). Confirm it for your case. | |||||||||
| H10 | Ineffective human oversight (automation bias, rubber-stamping) | guide_word G14 | S2 | S1 | E3 | C2 | AI-SIL 1 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Pays supplier invoice' runs many times per day; for 'Ineffective oversight' the hazard situation usually occurs about as often as that (E4). · Starting point: in the 60 reference cases the harm of 'Ineffective oversight' could typically be corrected only with effort or delay (C2). Confirm it for your case. | |||||||||
| H12 | Untraceable decision (no evidence for audit or incident analysis) | guide_word G13 | S2 | S1 | E2 | C3 | AI-SIL 1 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Matches invoice to purchase order' runs many times per day; for 'Untraceable decision' the hazard situation usually occurs about as often as that (E4). · Starting point: in the 60 reference cases the harm of 'Untraceable decision' could typically be corrected only with effort or delay (C2). Confirm it for your case. · Once step 'Sends payment advice email to supplier' has taken effect, it cannot be undone. Ask whether the harm can still be corrected before it causes real damage. | |||||||||
| H13 | Runaway consumption or loop (cost, rate, resources) | guide_word G07 | S2 | S1 | E4 | C2 | AI-SIL 2 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Pays supplier invoice' runs many times per day; for 'Runaway loop' the hazard situation usually occurs somewhat less often (E3). · Starting point: in the 60 reference cases the harm of 'Runaway loop' could typically be corrected at once (C1). Confirm it for your case. | |||||||||
| H14 | Third-party component failure or compromise (model, tool, plugin, agent product) | trigger T11 | S2 | S1 | E2 | C2 | AI-SIL 0 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Matches invoice to purchase order' runs many times per day; for 'Third-party failure' the hazard situation usually occurs much less often (E2). · Starting point: in the 60 reference cases the harm of 'Third-party failure' could typically be corrected only with effort or delay (C2). Confirm it for your case. · Once step 'Sends payment advice email to supplier' has taken effect, it cannot be undone. Ask whether the harm can still be corrected before it causes real damage. | |||||||||
| H15 | Misleading communication to humans (undisclosed AI, overtrust, impersonation) | trigger T13 | S1 | S1 | E4 | C1 | AI-SIL 0 | – | – |
| Reasons: The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Sends payment advice email to supplier' runs many times per day; for 'Misleading communication' the hazard situation usually occurs about as often as that (E4). · Starting point: in the 60 reference cases the harm of 'Misleading communication' could typically be corrected only with effort or delay (C2). Confirm it for your case. · Once step 'Sends payment advice email to supplier' has taken effect, it cannot be undone. Ask whether the harm can still be corrected before it causes real damage. | |||||||||
| H16 | Required action not performed (silent omission) | guide_word G01 | S2 | S1 | E3 | C1 | AI-SIL 0 | – | – |
| Reasons: Step 'Pays supplier invoice' moves money and its maximum size is material (A08): at least S2 for the organization or for the affected persons. · The agent decides about, or informs decisions about, suppliers: consider at least S2 for them. · Step 'Pays supplier invoice' runs many times per day; for 'Silent omission' the hazard situation usually occurs somewhat less often (E3). · Starting point: in the 60 reference cases the harm of 'Silent omission' could typically be corrected at once (C1). Confirm it for your case. | |||||||||
Irreversible and unattended: The agent can take an action that cannot be undone, and no person checks it before it takes effect.
Rubber-stamp approval: A person formally approves, but may not be able to really check: too many cases, too little context, or no measured error-detection rate.
Untrusted input meets private data: The agent reads outside content that anyone can shape, and it also handles personal or confidential data. Hidden instructions in that content could make it leak or misuse the data.
Critical even if rare: At least one hazard could cause severe harm. It stays visible even when it is unlikely, because rare does not mean acceptable.
- Flow AI-SIL (highest)
- AI-SIL 3
Hazards marked not relevant
| ID | Hazard | Reason |
|---|---|---|
| H07 | Sensitive data disclosure or privacy breach | Personal data limited to sole-trader bank details from the vendor master; covered by GA14 |
| H11 | Silent degradation after model, prompt or context change | Covered by H14 (vendor-managed model) for this flow |
2.3 Rights, regulatory flags and legal obligations
| ID | Question | Answer | Flag |
|---|---|---|---|
| T02 | Do decisions affect persons outside the organization (customers, applicants, citizens)? | yes | Runs fundamental-rights screening and the explanation and appeal path, where the agent decides about persons |
| T03 | Is the deployer a public body, a provider of public services or using AI for credit scoring or life/health-insurance pricing? | no | Flags a legally mandatory FRIA (EU AI Act Art. 27) |
| T04 | Is the use case possibly in an EU AI Act Annex III area (e.g. employment, credit, education, essential services)? | no | Flags high-risk obligations; recommends expert review |
| T13 | Does the agent communicate directly with humans (chat, email, voice)? | yes | AI disclosure (EU AI Act Art. 50) |
Legal obligations · the listed measures contribute to these obligations
| ID | Regime | Reference | Obligation | Measures (contribute to) |
|---|---|---|---|---|
| LO01 | EU AI Act | Art. 4 | AI literacy of staff dealing with the AI system | M39 |
| LO04 | EU AI Act | Art. 50 | Transparency: persons are informed that they interact with an AI system | M34 |
3 · Measures and verification
3.1 Bow-tie view of top hazards
3.2 Measures by phase
Phase 0 · Before go-live
All ++ measures (prevent and detect & recover) · all decided grey areas implemented · undecided grey areas linked to S3 hazards resolved
| ID | Measure | Grade | Barrier | Control type | How you'll do it | Verification | Reviewed by | Status |
|---|---|---|---|---|---|---|---|---|
| M01 | Item definition and operating envelope documented (task, authority, action space, contexts allowed) | ++ | Prevent | Process | The head of accounts payable approves a one-page operating envelope: the agent matches and pays approved supplier invoices in one company code, in EUR, up to €250k per invoice; foreign currencies, new countries, credit notes and bank-detail changes are excluded. | V1 Design review | – | specified |
| M02 | Least-privilege, scoped and non-transferable agent authority | ++ | Prevent | Structural | The agent's ERP and payment API roles allow only creating payments to suppliers in the vendor master, in company code 1000; it cannot change vendor master data, bank details or limits. IT security reviews the roles each quarter. | V1 Design review; V2 Control audit | – | specified |
| M04 | Hard action limits enforced outside the model (value caps, rate limits, allow-lists) | ++ | Prevent | Rule-based | The payment API, not the prompt, rejects any payment above €250k, more than 50 payments per hour and more than €500k per day from the agent's account. | V1 Design review; V3 Scenario-based evaluation (evals) | – | specified |
| M05 | Reversibility by design: prefer reversible actions; staging or undo for irreversible ones | ++ | Prevent | Structural | Payments are staged in the daily bank payment run and released after two hours unless a clerk stops them; the agent never sends instant payments. | V1 Design review; V3 Scenario-based evaluation (evals) | – | specified |
| M06 | Oversight mode defined per action class (in / on / out of the loop) | ++ | Prevent | Process | Below €10k the agent pays autonomously with sampling (M51); from €10k to €250k a clerk approves each payment; above €250k, foreign currency or a new country, the agent never acts. | V1 Design review | – | specified |
| M07 | Approval gate for irreversible or above-threshold actions | ++ | Prevent | Structural | Every payment of €10k or more waits for approval by an accounts payable clerk in the ERP workflow; the agent cannot approve its own proposals. | V1 Design review; V3 Scenario-based evaluation (evals) | – | specified |
| M08 | Oversight sufficiency test (Sufficient / Nominal / Insufficient / Theatrical), incl. measured error-detection rate of reviewers | ++ | Detect & recover | Process | Each quarter the AP team lead checks review time per item and reviewer workload (40 reviews per hour at most) and seeds 10 known-faulty payments per month to measure the clerks' detection rate. | V2 Control audit; V5 Runtime monitoring and log review | – | specified |
| M09 | Oversight metrics monitored (override rate, response time, outlier reviewers) | ++ | Detect & recover | Process | A weekly dashboard shows override rate, response time and approvals per clerk; the AP team lead follows up on clerks who approve everything or nothing. | V5 Runtime monitoring and log review | – | specified |
| M10 | Decision context package for reviewers (reasoning summary, evidence, flags) | ++ | Detect & recover | Model-based | The approval screen shows the invoice, the matched order, deviations from it, the vendor's payment history and the agent's short reasoning, with anomalies highlighted. | V3 Scenario-based evaluation (evals) | – | specified |
| M11 | Defined safe state and degradation modes | ++ | Detect & recover | Structural | On an anomaly alert, a failed check or a stop, the agent pauses all open payments and the accounts payable team works the queue manually from the ERP. | V1 Design review; V3 Scenario-based evaluation (evals) | – | specified |
| M12 | Escalation on uncertainty (calibrated uncertainty signal plus escalation rule; no raw confidence %) | ++ | Detect & recover | Model-based | When invoice and order differ by more than 2%, a field is missing or the match is weak, the agent hands the case to accounts payable with its reasons and does not pay. | V3 Scenario-based evaluation (evals) | – | specified |
| M13 | Kill switch: halt and lock autonomous action | ++ | Detect & recover | Structural | The AP team lead and IT operations can stop and lock the agent with one click in the operations console; the stop is tested on the first working day of each month. | V3 Scenario-based evaluation (evals) | – | specified |
| M14 | Behavioral anomaly and drift detection against a baseline | ++ | Detect & recover | Model-based | IT operations alerts the AP team lead within 15 minutes when daily payment volume, average amount or the share of new payees deviates by more than 30% from the 30-day baseline. | V5 Runtime monitoring and log review | – | specified |
| M15 | Outcome monitoring beyond the target metric (second-order effects) | ++ | Detect & recover | Process | Finance controlling tracks the cash position, early-payment share and supplier complaints monthly, not only the on-time payment rate. | V5 Runtime monitoring and log review | – | specified |
| M16 | Input and context validity check (data quality, staleness, domain match) | ++ | Prevent | Rule-based | Before matching, the agent rejects invoices with a missing order number, an unknown currency, an exchange rate older than one day or a vendor not in the vendor master, and routes them to accounts payable. | V3 Scenario-based evaluation (evals) | – | specified |
| M17 | Incident and near-miss reporting process | ++ | Detect & recover | Process | Clerks report every stopped, reversed or doubtful payment on the incident form; the head of accounts payable reviews all reports monthly with IT. | V2 Control audit | – | specified |
| M18 | Decision logging (inputs, actions, model version, rationale) | ++ | Detect & recover | Structural | For each payment the agent logs the invoice and order IDs, the decision, the amount, the model version and the approver in the ERP audit log. | V2 Control audit; V5 Runtime monitoring and log review | – | specified |
| M20 | Log retention and audit access defined | ++ | Detect & recover | Governance | Logs are kept for 10 years as required for accounting records; internal and external auditors have read access through a request to IT. | V2 Control audit | – | specified |
| M21 | Scenario-based evaluation before release (representative, edge and failure cases) | ++ | Prevent | Process | Before release, the agent is tested on 500 historical invoices, including duplicates, partial deliveries and the known fraud cases of the last three years; release needs at least 99.5% correct decisions and no fraudulent payment. | V3 Scenario-based evaluation (evals) | – | specified |
| M22 | Known-unsafe scenarios detected and routed to humans | ++ | Prevent | Rule-based | Invoices in foreign currency, from a new country, with changed bank details or from a vendor created in the last 30 days always go to a clerk. | V3 Scenario-based evaluation (evals) | – | specified |
| M23 | Unknown-unsafe exploration (red-teaming, adversarial edge cases) | ++ | Prevent | Process | Before go-live and after each major change, the security team tries fake invoices, changed bank details and hidden instructions in invoice PDFs and emails; findings are fixed before release. | V4 Adversarial testing (red-teaming) | – | specified |
| M24 | Staged deployment (shadow → limited → full) | ++ | Prevent | Process | One month in shadow mode (proposals only), then one month with 10% of invoices below €10k, then all invoices; the head of accounts payable approves each step on the test results. | V2 Control audit | – | specified |
| M25 | Regression re-test after model, prompt or tool change | ++ | Detect & recover | Process | IT reruns the 500-invoice test set after every model, prompt or tool change, including vendor model updates, before the change goes live. | V6 Periodic re-testing | – | specified |
| M26 | Untrusted content isolation (external content treated as data; provenance marked) | ++ | Prevent | Prompt-layer / Structural | Invoice PDFs and email text are passed to the model as data with their source marked; text that looks like an instruction is ignored and flagged to accounts payable. | V4 Adversarial testing (red-teaming) | – | specified |
| M27 | Tool-call validation and safe output handling (schema checks, sandboxed execution) | ++ | Prevent | Rule-based | Every payment call is checked against the API schema, the vendor master and the matched order before it runs; any mismatch blocks the call. | V3 Scenario-based evaluation (evals); V4 Adversarial testing (red-teaming) | – | specified |
| M29 | Secrets and credential isolation (no secrets in context, short-lived tokens) | ++ | Prevent | Structural | The agent gets short-lived tokens from the company vault for the ERP and the payment API; no keys or passwords appear in prompts or logs. | V2 Control audit | – | specified |
| M30 | Supply-chain vetting of models, tools and agent products | ++ | Prevent | Governance | Procurement and IT security vet the LLM vendor (security certification, update policy, data location in the EU) before contract and each year after. | V2 Control audit; V7 Independent assessment / certification | – | specified |
| M31 | Data provenance and quality gate | ++ | Prevent | Process | Procurement owns the vendor master; new vendors and bank details are created only after the four-eyes check, and the data is validated monthly. | V2 Control audit | – | specified |
| M34 | AI disclosure to people who interact with the agent or receive its content | ++ | Prevent | Process | Each payment advice email states that it was prepared with AI support and names the accounts payable mailbox for questions and disputes. | V2 Control audit | – | specified |
| M35 | Named accountable owner and responsibility matrix (value chain + three lines of defense) | ++ | Prevent | Governance | The head of accounts payable is accountable and the AP team lead is deputy; responsibilities are agreed with IT, procurement and compliance in a signed RACI. | V2 Control audit | – | specified |
| M36 | Re-classification triggers defined and monitored | ++ | Detect & recover | Process | The analysis is redone when the model, volume, limits or scope change, and at least once a year; the process owner checks the triggers each quarter. | V2 Control audit; V6 Periodic re-testing | – | specified |
| M38 | Independent safety assessment before go-live | ++ | Prevent | Process | Internal audit reviews this Safety Concept and the test evidence before go-live and signs off the release. | V7 Independent assessment / certification | – | specified |
| M39 | Operator and user training; AI literacy; end-user responsibility | ++ | Prevent | Process | All clerks complete a two-hour training on reviewing agent payments, typical fraud signs and how to stop the agent, before go-live and yearly. | V2 Control audit | – | specified |
| M40 | Agent interaction map and trust boundaries (freedom from interference) | ++ | Prevent | Structural | The interaction map shows the ordering agent, the ERP and the house bank API; the payment agent accepts orders only from the ordering agent's validated ERP queue. | V1 Design review | – | specified |
| M41 | Authenticated and validated inter-agent messaging | ++ | Prevent | Structural | Messages between the ordering agent and the payment agent are signed and checked; unsigned or altered orders are rejected and reported to IT security. | V4 Adversarial testing (red-teaming) | – | specified |
| M42 | Network circuit breakers (aggregate thresholds regardless of contributing agent) | ++ | Detect & recover | Rule-based | IT operations halts all agents when total payments across agents exceed €1m within four hours, regardless of which agent contributed. | V3 Scenario-based evaluation (evals) | – | specified |
| M43 | Independence check for decomposed or layered controls (no shared base model, context or memory) | ++ | Prevent | Process | The payment checks run in a rule engine with their own data access, not in the same model, context or memory as the agent; IT security confirms this at each change. | V1 Design review; V7 Independent assessment / certification | – | specified |
| M45 | Answers and statements only from authoritative, versioned sources; otherwise hand over to a human | ++ | Prevent | Rule-based | In payment advice emails the agent states amounts, dates and invoice numbers only from the ERP payment record; anything else goes to accounts payable. | V3 Scenario-based evaluation (evals) | – | specified |
| M46 | No commitments, offers or exceptions outside the agent's authority; such requests are routed to a human | ++ | Prevent | Rule-based | The agent never agrees to early-payment discounts, deadline extensions or other exceptions; such requests are forwarded to accounts payable. | V1 Design review; V3 Scenario-based evaluation (evals) | – | specified |
| M48 | Data minimization in agent context and outputs | ++ | Prevent | Structural | The agent receives invoice and order fields and the vendor's bank details only; it has no access to contracts, employee data or other vendors' data. | V2 Control audit | – | specified |
| M49 | Output and egress control (no auto-rendered external links or images; egress allow-list) | ++ | Prevent | Structural | Payment advice emails are plain text without links or images; the agent can connect only to the ERP, the payment API and the company mail server. | V1 Design review; V4 Adversarial testing (red-teaming) | – | specified |
| M50 | Environment separation (sandbox or staging; gated production writes) and tested restore | ++ | Prevent | Structural | The agent prepares the payment file in a staging area; release to the bank needs the separate, gated payment run, and the restore of the payment file is tested each quarter. | V1 Design review; V3 Scenario-based evaluation (evals) | – | specified |
| M51 | Audit by sampling of autonomous decisions | ++ | Detect & recover | Process | Each week a clerk re-checks 30 randomly selected autonomous payments below €10k; the error rate is reported to the head of accounts payable. | V5 Runtime monitoring and log review | – | specified |
Phase 1 · Within 3 months
All + measures · open points without S3 link
| ID | Measure | Grade | Barrier | Control type | How you'll do it | Verification | Reviewed by | Status |
|---|---|---|---|---|---|---|---|---|
| M03 | Unique agent identity registered in an agent catalog | + | Prevent | Structural | The agent is registered in the IT asset catalog with its own ID, the head of accounts payable as owner, and its ERP and payment API permissions. | V2 Control audit | – | specified |
| M19 | Tamper-evident logs | + | Detect & recover | Structural | Decision logs are written to write-once storage with integrity checks; IT security verifies the integrity weekly. | V2 Control audit | – | specified |
| M37 | Minimum development process capability | + | Prevent | Process | Prompts and configurations are under version control with review by a second person and documented tests before each change. | V2 Control audit | – | specified |
| M44 | Cross-firm interface contract (assume / guarantee safety obligations) | + | Prevent | Governance | The contract with the house bank defines its validation duties, its fraud screening and liability for unauthorized payments. | V2 Control audit | – | specified |
Phase 2 · Continuous
Runtime monitoring (M14, M15), oversight metrics (M09), re-testing (M25), re-classification (M36), periodic audits (T5)
None.
3.3 Deviations
No deviations.
4 · Open points and lifecycle
4.1 Open points by expert group
Engineering / IT
| ID | Open point | Linked hazards | Before go-live |
|---|---|---|---|
| GA09 | Failure mid-action | H16, H01 | no |
Process owner + legal
| ID | Open point | Linked hazards | Before go-live |
|---|---|---|---|
| GA10 | Error discovered afterwards | H03, H12 | no |
Legal / compliance
| ID | Open point | Linked hazards | Before go-live |
|---|---|---|---|
| GA11 | Objection by an affected person | H08, H15 | no |
Process owner
| ID | Open point | Linked hazards | Before go-live |
|---|---|---|---|
| GA15 | Switch-off and fallback | H16, H11 | no |
Expert review
| ID | Open point | Linked hazards | Before go-live |
|---|---|---|---|
| T14 | Marked unsure | H04 | no |
4.2 Re-classification triggers
- M36
- Re-classification triggers defined and monitored
- Can the model or provider change outside the deployer's control?
- yes
The classification must follow changes in use and technology.
5 · Compliance legend
5.1 Contribution table
Legend entries mean "contributes to" a framework or standard — never a statement of conformity. Status: indicative, to verify.
| ID | Measure | Contributes to: EU AI Act | ISO/IEC 42001 | NIST AI RMF | Singapore MGF | Verification schemes |
|---|---|---|---|---|---|---|
| M01 | Item definition and operating envelope documented (task, authority, action space, contexts allowed) | Art. 9, 11 | Cl. 6, 8; A.6 | MAP | D1 Assess and bound risks upfront | Design review |
| M02 | Least-privilege, scoped and non-transferable agent authority | Art. 15, 26 | A.6, A.9 | MANAGE | D1 Assess and bound risks upfront; D3 Implement technical controls and processes | ISO 27001, AIUC-1 |
| M03 | Unique agent identity registered in an agent catalog | Art. 26 | A.6 | GOVERN | D1 Assess and bound risks upfront | – |
| M04 | Hard action limits enforced outside the model (value caps, rate limits, allow-lists) | Art. 9, 15 | A.6 | MANAGE | D3 Implement technical controls and processes | AIUC-1 |
| M05 | Reversibility by design: prefer reversible actions; staging or undo for irreversible ones | Art. 9, 14 | A.6 | MANAGE | D3 Implement technical controls and processes | – |
| M06 | Oversight mode defined per action class (in / on / out of the loop) | Art. 14, 26 | A.9 | GOVERN | D2 Make humans meaningfully accountable | – |
| M07 | Approval gate for irreversible or above-threshold actions | Art. 14 | A.9 | MANAGE | D2 Make humans meaningfully accountable; D3 Implement technical controls and processes | – |
| M08 | Oversight sufficiency test (Sufficient / Nominal / Insufficient / Theatrical), incl. measured error-detection rate of reviewers | Art. 14 | A.9 | MEASURE | D2 Make humans meaningfully accountable | – |
| M09 | Oversight metrics monitored (override rate, response time, outlier reviewers) | Art. 14, 26 | A.9 | MEASURE | D2 Make humans meaningfully accountable | – |
| M10 | Decision context package for reviewers (reasoning summary, evidence, flags) | Art. 13, 14 | A.8, A.9 | MANAGE | D2 Make humans meaningfully accountable | – |
| M11 | Defined safe state and degradation modes | Art. 9, 15 | A.6 | MANAGE | D3 Implement technical controls and processes | – |
| M12 | Escalation on uncertainty (calibrated uncertainty signal plus escalation rule; no raw confidence %) | Art. 14, 15 | A.6 | MANAGE | D3 Implement technical controls and processes | – |
| M13 | Kill switch: halt and lock autonomous action | Art. 14 | A.6, A.9 | MANAGE | D3 Implement technical controls and processes | – |
| M14 | Behavioral anomaly and drift detection against a baseline | Art. 15, 72 | Cl. 9; A.6 | MEASURE | D3 Implement technical controls and processes | – |
| M15 | Outcome monitoring beyond the target metric (second-order effects) | Art. 9, 72 | Cl. 9 | MEASURE | D3 Implement technical controls and processes | – |
| M16 | Input and context validity check (data quality, staleness, domain match) | Art. 10, 15 | A.7 | MEASURE | D3 Implement technical controls and processes | – |
| M17 | Incident and near-miss reporting process | Art. 73 | Cl. 10 | MANAGE | D3 Implement technical controls and processes | – |
| M18 | Decision logging (inputs, actions, model version, rationale) | Art. 12, 19, 26 | A.6 | MEASURE | D3 Implement technical controls and processes | AIUC-1 |
| M19 | Tamper-evident logs | Art. 12, 15 | A.6 | MANAGE | D3 Implement technical controls and processes | ISO 27001 |
| M20 | Log retention and audit access defined | Art. 19, 26 | Cl. 7.5 | GOVERN | D3 Implement technical controls and processes | ISO 27001 |
| M21 | Scenario-based evaluation before release (representative, edge and failure cases) | Art. 9, 15 | A.6 | MEASURE | D3 Implement technical controls and processes | AIUC-1 |
| M22 | Known-unsafe scenarios detected and routed to humans | Art. 9 | A.6 | MEASURE | D3 Implement technical controls and processes | – |
| M23 | Unknown-unsafe exploration (red-teaming, adversarial edge cases) | Art. 9, 15 | A.6 | MEASURE | D3 Implement technical controls and processes | AIUC-1 |
| M24 | Staged deployment (shadow → limited → full) | Art. 9 | A.6 | MANAGE | D1 Assess and bound risks upfront; D3 Implement technical controls and processes | – |
| M25 | Regression re-test after model, prompt or tool change | Art. 9, 15 | A.6 | MEASURE | D3 Implement technical controls and processes | AIUC-1 |
| M26 | Untrusted content isolation (external content treated as data; provenance marked) | Art. 15 | A.6 | MANAGE | D3 Implement technical controls and processes | AIUC-1, ISO 27001 |
| M27 | Tool-call validation and safe output handling (schema checks, sandboxed execution) | Art. 15 | A.6 | MANAGE | D3 Implement technical controls and processes | AIUC-1 |
| M29 | Secrets and credential isolation (no secrets in context, short-lived tokens) | Art. 15 | A.6 | MANAGE | D3 Implement technical controls and processes | ISO 27001, SOC 2 |
| M30 | Supply-chain vetting of models, tools and agent products | Art. 25, 26 | A.10 | GOVERN | D1 Assess and bound risks upfront | AIUC-1, ISO 27001 |
| M31 | Data provenance and quality gate | Art. 10 | A.7 | MAP | D1 Assess and bound risks upfront | – |
| M34 | AI disclosure to people who interact with the agent or receive its content | Art. 50 | A.8 | GOVERN | D4 Enable end-user responsibility | – |
| M35 | Named accountable owner and responsibility matrix (value chain + three lines of defense) | Art. 17, 26 | Cl. 5; A.3 | GOVERN | D2 Make humans meaningfully accountable | ISO 42001 |
| M36 | Re-classification triggers defined and monitored | Art. 9, 72 | Cl. 9, 10 | MANAGE | D1 Assess and bound risks upfront | – |
| M37 | Minimum development process capability | Art. 17 | Cl. 8; A.6 | GOVERN | D3 Implement technical controls and processes | ISO 42001 |
| M38 | Independent safety assessment before go-live | Art. 43 | Cl. 9 | MEASURE | D2 Make humans meaningfully accountable | Art. 43 conformity assessment, AIUC-1 |
| M39 | Operator and user training; AI literacy; end-user responsibility | Art. 4, 26 | Cl. 7.2; A.4 | GOVERN | D4 Enable end-user responsibility | – |
| M40 | Agent interaction map and trust boundaries (freedom from interference) | Art. 15 | A.6 | MAP | D3 Implement technical controls and processes | – |
| M41 | Authenticated and validated inter-agent messaging | Art. 15 | A.6 | MANAGE | D3 Implement technical controls and processes | AIUC-1 |
| M42 | Network circuit breakers (aggregate thresholds regardless of contributing agent) | Art. 9, 15 | A.6 | MANAGE | D3 Implement technical controls and processes | – |
| M43 | Independence check for decomposed or layered controls (no shared base model, context or memory) | Art. 15 | A.6 | MEASURE | D3 Implement technical controls and processes | – |
| M44 | Cross-firm interface contract (assume / guarantee safety obligations) | Art. 25 | A.10 | GOVERN | D1 Assess and bound risks upfront | – |
| M45 | Answers and statements only from authoritative, versioned sources; otherwise hand over to a human | Art. 13, 15 | A.6, A.8 | MANAGE | D3 Implement technical controls and processes | – |
| M46 | No commitments, offers or exceptions outside the agent's authority; such requests are routed to a human | Art. 14, 26 | A.6 | GOVERN | D1 Assess and bound risks upfront; D3 Implement technical controls and processes | – |
| M48 | Data minimization in agent context and outputs | Art. 10 | A.7 | MANAGE | D3 Implement technical controls and processes | – |
| M49 | Output and egress control (no auto-rendered external links or images; egress allow-list) | Art. 15 | A.6 | MANAGE | D3 Implement technical controls and processes | – |
| M50 | Environment separation (sandbox or staging; gated production writes) and tested restore | Art. 9, 15 | A.6 | MANAGE | D3 Implement technical controls and processes | – |
| M51 | Audit by sampling of autonomous decisions | Art. 14, 26, 72 | A.9; Cl. 9 | MEASURE | D2 Make humans meaningfully accountable; D3 Implement technical controls and processes | – |
Annex A · Implementation binding
To be filled by engineering: how each requirement is implemented (tool, configuration, process).
| ID | Requirement | Implemented by (tool, configuration, process) |
|---|---|---|
| M01 | Item definition and operating envelope documented (task, authority, action space, contexts allowed) | The head of accounts payable approves a one-page operating envelope: the agent matches and pays approved supplier invoices in one company code, in EUR, up to €250k per invoice; foreign currencies, new countries, credit notes and bank-detail changes are excluded. |
| M02 | Least-privilege, scoped and non-transferable agent authority | The agent's ERP and payment API roles allow only creating payments to suppliers in the vendor master, in company code 1000; it cannot change vendor master data, bank details or limits. IT security reviews the roles each quarter. |
| M03 | Unique agent identity registered in an agent catalog | The agent is registered in the IT asset catalog with its own ID, the head of accounts payable as owner, and its ERP and payment API permissions. |
| M04 | Hard action limits enforced outside the model (value caps, rate limits, allow-lists) | The payment API, not the prompt, rejects any payment above €250k, more than 50 payments per hour and more than €500k per day from the agent's account. |
| M05 | Reversibility by design: prefer reversible actions; staging or undo for irreversible ones | Payments are staged in the daily bank payment run and released after two hours unless a clerk stops them; the agent never sends instant payments. |
| M06 | Oversight mode defined per action class (in / on / out of the loop) | Below €10k the agent pays autonomously with sampling (M51); from €10k to €250k a clerk approves each payment; above €250k, foreign currency or a new country, the agent never acts. |
| M07 | Approval gate for irreversible or above-threshold actions | Every payment of €10k or more waits for approval by an accounts payable clerk in the ERP workflow; the agent cannot approve its own proposals. |
| M08 | Oversight sufficiency test (Sufficient / Nominal / Insufficient / Theatrical), incl. measured error-detection rate of reviewers | Each quarter the AP team lead checks review time per item and reviewer workload (40 reviews per hour at most) and seeds 10 known-faulty payments per month to measure the clerks' detection rate. |
| M09 | Oversight metrics monitored (override rate, response time, outlier reviewers) | A weekly dashboard shows override rate, response time and approvals per clerk; the AP team lead follows up on clerks who approve everything or nothing. |
| M10 | Decision context package for reviewers (reasoning summary, evidence, flags) | The approval screen shows the invoice, the matched order, deviations from it, the vendor's payment history and the agent's short reasoning, with anomalies highlighted. |
| M11 | Defined safe state and degradation modes | On an anomaly alert, a failed check or a stop, the agent pauses all open payments and the accounts payable team works the queue manually from the ERP. |
| M12 | Escalation on uncertainty (calibrated uncertainty signal plus escalation rule; no raw confidence %) | When invoice and order differ by more than 2%, a field is missing or the match is weak, the agent hands the case to accounts payable with its reasons and does not pay. |
| M13 | Kill switch: halt and lock autonomous action | The AP team lead and IT operations can stop and lock the agent with one click in the operations console; the stop is tested on the first working day of each month. |
| M14 | Behavioral anomaly and drift detection against a baseline | IT operations alerts the AP team lead within 15 minutes when daily payment volume, average amount or the share of new payees deviates by more than 30% from the 30-day baseline. |
| M15 | Outcome monitoring beyond the target metric (second-order effects) | Finance controlling tracks the cash position, early-payment share and supplier complaints monthly, not only the on-time payment rate. |
| M16 | Input and context validity check (data quality, staleness, domain match) | Before matching, the agent rejects invoices with a missing order number, an unknown currency, an exchange rate older than one day or a vendor not in the vendor master, and routes them to accounts payable. |
| M17 | Incident and near-miss reporting process | Clerks report every stopped, reversed or doubtful payment on the incident form; the head of accounts payable reviews all reports monthly with IT. |
| M18 | Decision logging (inputs, actions, model version, rationale) | For each payment the agent logs the invoice and order IDs, the decision, the amount, the model version and the approver in the ERP audit log. |
| M19 | Tamper-evident logs | Decision logs are written to write-once storage with integrity checks; IT security verifies the integrity weekly. |
| M20 | Log retention and audit access defined | Logs are kept for 10 years as required for accounting records; internal and external auditors have read access through a request to IT. |
| M21 | Scenario-based evaluation before release (representative, edge and failure cases) | Before release, the agent is tested on 500 historical invoices, including duplicates, partial deliveries and the known fraud cases of the last three years; release needs at least 99.5% correct decisions and no fraudulent payment. |
| M22 | Known-unsafe scenarios detected and routed to humans | Invoices in foreign currency, from a new country, with changed bank details or from a vendor created in the last 30 days always go to a clerk. |
| M23 | Unknown-unsafe exploration (red-teaming, adversarial edge cases) | Before go-live and after each major change, the security team tries fake invoices, changed bank details and hidden instructions in invoice PDFs and emails; findings are fixed before release. |
| M24 | Staged deployment (shadow → limited → full) | One month in shadow mode (proposals only), then one month with 10% of invoices below €10k, then all invoices; the head of accounts payable approves each step on the test results. |
| M25 | Regression re-test after model, prompt or tool change | IT reruns the 500-invoice test set after every model, prompt or tool change, including vendor model updates, before the change goes live. |
| M26 | Untrusted content isolation (external content treated as data; provenance marked) | Invoice PDFs and email text are passed to the model as data with their source marked; text that looks like an instruction is ignored and flagged to accounts payable. |
| M27 | Tool-call validation and safe output handling (schema checks, sandboxed execution) | Every payment call is checked against the API schema, the vendor master and the matched order before it runs; any mismatch blocks the call. |
| M29 | Secrets and credential isolation (no secrets in context, short-lived tokens) | The agent gets short-lived tokens from the company vault for the ERP and the payment API; no keys or passwords appear in prompts or logs. |
| M30 | Supply-chain vetting of models, tools and agent products | Procurement and IT security vet the LLM vendor (security certification, update policy, data location in the EU) before contract and each year after. |
| M31 | Data provenance and quality gate | Procurement owns the vendor master; new vendors and bank details are created only after the four-eyes check, and the data is validated monthly. |
| M34 | AI disclosure to people who interact with the agent or receive its content | Each payment advice email states that it was prepared with AI support and names the accounts payable mailbox for questions and disputes. |
| M35 | Named accountable owner and responsibility matrix (value chain + three lines of defense) | The head of accounts payable is accountable and the AP team lead is deputy; responsibilities are agreed with IT, procurement and compliance in a signed RACI. |
| M36 | Re-classification triggers defined and monitored | The analysis is redone when the model, volume, limits or scope change, and at least once a year; the process owner checks the triggers each quarter. |
| M37 | Minimum development process capability | Prompts and configurations are under version control with review by a second person and documented tests before each change. |
| M38 | Independent safety assessment before go-live | Internal audit reviews this Safety Concept and the test evidence before go-live and signs off the release. |
| M39 | Operator and user training; AI literacy; end-user responsibility | All clerks complete a two-hour training on reviewing agent payments, typical fraud signs and how to stop the agent, before go-live and yearly. |
| M40 | Agent interaction map and trust boundaries (freedom from interference) | The interaction map shows the ordering agent, the ERP and the house bank API; the payment agent accepts orders only from the ordering agent's validated ERP queue. |
| M41 | Authenticated and validated inter-agent messaging | Messages between the ordering agent and the payment agent are signed and checked; unsigned or altered orders are rejected and reported to IT security. |
| M42 | Network circuit breakers (aggregate thresholds regardless of contributing agent) | IT operations halts all agents when total payments across agents exceed €1m within four hours, regardless of which agent contributed. |
| M43 | Independence check for decomposed or layered controls (no shared base model, context or memory) | The payment checks run in a rule engine with their own data access, not in the same model, context or memory as the agent; IT security confirms this at each change. |
| M44 | Cross-firm interface contract (assume / guarantee safety obligations) | The contract with the house bank defines its validation duties, its fraud screening and liability for unauthorized payments. |
| M45 | Answers and statements only from authoritative, versioned sources; otherwise hand over to a human | In payment advice emails the agent states amounts, dates and invoice numbers only from the ERP payment record; anything else goes to accounts payable. |
| M46 | No commitments, offers or exceptions outside the agent's authority; such requests are routed to a human | The agent never agrees to early-payment discounts, deadline extensions or other exceptions; such requests are forwarded to accounts payable. |
| M48 | Data minimization in agent context and outputs | The agent receives invoice and order fields and the vendor's bank details only; it has no access to contracts, employee data or other vendors' data. |
| M49 | Output and egress control (no auto-rendered external links or images; egress allow-list) | Payment advice emails are plain text without links or images; the agent can connect only to the ERP, the payment API and the company mail server. |
| M50 | Environment separation (sandbox or staging; gated production writes) and tested restore | The agent prepares the payment file in a staging area; release to the bank needs the separate, gated payment run, and the restore of the payment file is tested each quarter. |
| M51 | Audit by sampling of autonomous decisions | Each week a clerk re-checks 30 randomly selected autonomous payments below €10k; the error rate is reported to the head of accounts payable. |
Not needed in your context
| ID | Measure | Reason |
|---|---|---|
| M32 | Fundamental-rights screening of affected persons | Either nothing affects persons' rights, or the formal fundamental rights impact assessment (required by law here) replaces the screening. |
| M33 | Bias and fairness testing on affected groups | The agent decides nothing about individual persons and publishes or sends nothing that could treat groups unequally. |
| M47 | Lawful-basis review of decision logic and data items before go-live and after rule changes | No decision about individual persons is based on personal data. |
| M54 | Explanation on request and complaint route for persons affected by a decision | The agent decides nothing about individual persons. |
Annex B · Change log, self-check and rules applied
Version history
Live draft — not saved as a version yet.
Five-point self-check
| Check | Result |
|---|---|
| Understanding: every agent action is described | yes |
| Grey areas: every grey area is decided or an open point | yes · 10 decided · 4 open points |
| Side effects: every relevant hazard is rated | yes |
| Countermeasures: no ++ deviation without rationale and owner | yes |
| Reasoning: no open point linked to a critical-even-if-rare hazard | yes |
Rules applied
- Logic Pack
- v0.6.7
- SHA-256 checksum
- withheld in the public example
| Rule | What it does |
|---|---|
| RH05 | Starting point only; the user confirms correctability of the harm |
| RH12 | Binding or final effect of material size |
| RH14 | Affected-persons side of severity; S3 if livelihood, health or fundamental rights are touched |
| RH21 | |
| RH22 | Shown as context |
Annex C · Glossary and assumptions
Glossary
| Term | Definition |
|---|---|
| Agent / agentic AI | An AI system that takes actions toward a goal with some autonomy, e.g. calling tools, sending messages or making payments. |
| Action | Something the agent does that changes the world, e.g. "pays supplier invoice". |
| Hazard | A way the agent could cause harm, e.g. paying the wrong recipient. |
| Harm | Damage to the organization or to affected persons: financial, reputational, regulatory, operational, rights, health or safety. |
| Severity (S) | How bad the harm would be: the higher of harm to the organization and harm to affected persons. |
| Exposure (E) | How often the agent acts on its own in the situation where the hazard can occur. |
| Controllability (C) | How well a human can detect, understand, intervene and reverse in time. |
| AI-SIL | AI Safety Integrity Level 0–4: how much engineering rigor the flow needs. Derived from S, E and C. |
| Critical-even-if-rare | A hazard with the highest severity (S3), always shown even if its AI-SIL is low. |
| Grey area | Agent behavior that has not been decided yet, e.g. what happens when data is missing. |
| Guide word | A short prompt like "too much" or "too late" used to think through what could go wrong with an action. |
| Measure | A requirement that reduces risk: a design rule, control, process or check. |
| Safe state | The predefined behavior the agent switches to when something is wrong, e.g. pause and hand over to a human. |
| Human oversight (in / on / out of the loop) | Human approves before the action / monitors and can intervene / is not involved in the individual action. |
| Oversight sufficiency | Whether human review is real: enough time, information and authority to intervene. Otherwise it is "theatrical". |
| Decomposition | Splitting a safety goal across independent elements, e.g. the agent and a deterministic guard, so that each carries part of the rigor. Written X(Y): rigor X, goal Y. |
| Independence | Two layers are independent only if they do not share the same model, data or blind spots. |
| Verification | Proof that a measure is implemented and works: review, audit, evals, red-teaming, monitoring or assessment. |
| FRIA | Fundamental rights impact assessment under EU AI Act Art. 27; legally required for certain deployers. |
| AASIF Safety Concept | The living document per business flow with scope, risks, AI-SIL, measures, roadmap and contributions to regulations. |
| Contributes to | How AASIF describes its link to regulations and standards: a measure supports an obligation; it does not certify compliance. |
| Hazard situation | The situation in which a hazard can occur. Exposure counts how often it occurs, not how often the agent runs. |
| Element | A part of the architecture that carries part of a safety goal: the agent, a guard, a human gate, a separation or a diverse model. |
| Qualified human gate | A human check that meets four criteria (independent source check; competence, time and authority; measured detection rate; logged and auditable). Since v0.6 it can be used as decomposition pattern DP4; it never lowers C by itself. |
Assumptions
This Safety Concept docks into the organization's existing management system (e.g. ISO/IEC 42001); it does not replace it.
Ratings, decisions and measures reflect the answers given at the date of this document and must be re-opened when a re-classification trigger occurs.
Test version: generated by the AASIF test tool with an uncalibrated Logic Pack. Not a certification.
Annex D · Quality checks and traceability
Quality checks · 15 of 18 passed
| ID | Check | Result |
|---|---|---|
| C01 | At least one agent action is defined | passed |
| C02 | Each action has been run through all guide words (T8), or a guide word is marked not applicable | open: ACT-01:G01, ACT-01:G02, ACT-01:G03, ACT-01:G04, ACT-01:G06, ACT-01:G08, ACT-01:G09, ACT-01:G10, ACT-01:G11, ACT-01:G12, ACT-01:G13, ACT-01:G14, ACT-01:G15, ACT-01:G16, ACT-02:G01, ACT-02:G02, ACT-02:G03, ACT-02:G04, ACT-02:G05, ACT-02:G06, ACT-02:G07, ACT-02:G08, ACT-02:G09, ACT-02:G10, ACT-03:G01, ACT-03:G02, ACT-03:G03, ACT-03:G05, ACT-03:G06, ACT-03:G09, ACT-03:G10 |
| C03 | Each hazard type (malfunction, SOTIF, security, rights, oversight, accountability, lifecycle; multi-agent if T09 = yes) has at least one hazard selected or marked not relevant | passed |
| C04 | A pre-selected hazard marked "not relevant" needs a one-line reason | passed |
| C05 | "Unsure" counts as relevant and adds an expert-review flag | noted: T14 |
| C06 | Action marked 'not at all' undoable (A03) but harm rated C1 | open: H15 |
| C07 | E0 proposed although I14 = yes or T19 = yes (not allowed) | passed |
| C08 | Flow AI-SIL ≥ 3 → expert review of the classification recommended (independence per T5) | open: Expert review of the classification recommended |
| C09 | Undecided grey area linked to an S3 hazard → listed as go-live blocker | passed |
| C10 | A deselected ++ measure needs a rationale and an owner | passed |
| C11 | T09 = yes → network assessment measures (M40–M43) included | noted: M40, M41, M42, M43 |
| C12 | T7 T03 = yes → formal FRIA shown as legally required | passed |
| C13 | Every S3 hazard appears in section 2.4 and is considered for the bow-tie view | noted: H06 |
| C14 | Five-point self-check offered at the end (understanding, grey areas, side effects, countermeasures, reasoning) | not evaluated |
| C15 | T04 = yes (possible EU AI Act Annex III use) and flow AI-SIL < 2 → review the ratings; the AI-SIL is not overridden | passed |
| C16 | An action with A02 = physical actuation → scope notice: the domain functional-safety standard governs that action and its safety function; AASIF rates the remaining hazards of the flow and states the exclusion in the Safety Concept | passed |
| C17 | DP4 (qualified human gate) needs evidence text for each of the four A10 criteria on every linked action | not evaluated |
| C18 | Short path chosen but full rating gives flow AI-SIL ≥ 2 or any S3 → prompt to complete the full analysis | passed |
| C19 | Applicable legal obligations are listed in section 2.5 and their measures marked 'required by law' | noted: LO01, LO04 |
| C20 | Internal action with A09 = yes but every linked hazard rated S1 → review severity | passed |
| C21 | Split not allowed for the hazard's AI-SIL, element above its cap, or pattern does not cover the hazard → decomposition rejected with reason | not evaluated |
| C22 | Any independence question IQ1–IQ7 answered yes or unsure, or evidence missing → decomposition rejected with reason | not evaluated |
| C23 | Valid decomposition → M43 required and section 3.5 generated | not evaluated |
| C24 | Decomposed hazard without safe-state confirmation for the non-agent element (D-R5) | not evaluated |
Traceability
- Snapshot
- live draft
- AI suggestions
- on